Savings potential

Modular components make the work on site easier. Industrial prefabrication is the solution for cost-efficient projects. The savings potential of plug + go is enormous.

Low time requirement

The wiring time is minimal. Installation time at the building site is noticeably reduced.

Low total costs

Rapid installation, high quality, low defect frequency: the total costs reduce by up to 30%.

Shorter cable lengths

The cables are simply connected. Multiple junction boxes are likewise unnecessary.

Reduced fire load

Directly connected distribution blocks reduce the fire load by up to 60%. A clear plus in safety

Low volume of copper

The total amount of copper is around half compared to conventional installations.

Smaller equipment rooms

Less material thanks to intelligent cable management: Equipment rooms need less space.

The secret of plug + go: plug instead of screw! In this way, the installation time sinks on the building site and the total costs at the end are significantly lower than for conventional approaches.

While the defect frequency sinks on the building site, the quality of the work increases. Once planned, the installation is then quickly completed. Serial and modular building in the electrical trades is the solution for projects where rooms are repeated frequently.