Switch-off delay

The run-on time switches off the load after a switch-off command with a delay of this value (timespan). A switch-off command during an existing delay switches off the load immediately. If the load has not yet been switched off due to the delay when a switch-on command comes, then the load will remain on.

How to configure the switch-off delay for JUNG HOME devices:

  1. Select the function list on the Home screen and press on the socket-symbol.
  2. Select a JUNG HOME device.
  3. Press the gear symbol to get to configuration.
  4. Press on the parameters symbol.
  5. Press on switch-off delay and set the desired time.